Tiffin River at Stryker OH

USGS Site No: 04185000Tiffin River • Williams County, OH

Tiffin River at Stryker OH on the Tiffin River is currently at 73 cfs (Low — 21th percentile for this date) . Gage height: 3.65 ft.

Reading from

73
CFS Discharge
3.65
Gage Height (ft)
Low
Flow Condition
Normal
Flood Status

Historical Percentile Comparison

Today's discharge compared to the long-term record for June 11 at this station. Percentile rank shows what fraction of historical years had lower flow on this date.

Percentile Label CFS Threshold Today's Flow
10th Very Low threshold 49
25th Low threshold 81 Today: 73 cfs
50th (Median) Normal (median) 129
75th High threshold 300
95th Very High threshold 951

30-Day Hydrograph

Recent discharge plotted against the historical 10th–95th percentile envelope for the same calendar days. Source: USGS daily values + long-term statistics.

2.9k 1.4k 0 cfs Apr 6 May 28
10th–95th historical Day-of-year median Recent discharge

30-Day Flow History

Date Discharge (CFS) Gage Ht (ft)
May 28, 2026 93
May 27, 2026 100
May 26, 2026 103
May 25, 2026 102
May 24, 2026 96
May 23, 2026 91
May 22, 2026 93
May 21, 2026 103
May 20, 2026 109
May 19, 2026 112
May 18, 2026 113
May 17, 2026 122
May 16, 2026 123
May 15, 2026 129
Apr 21, 2026 1,450
Apr 20, 2026 1,690
Apr 19, 2026 1,920
Apr 18, 2026 1,960
Apr 17, 2026 1,450
Apr 16, 2026 949
Apr 15, 2026 455
Apr 14, 2026 306
Apr 13, 2026 350
Apr 12, 2026 432
Apr 11, 2026 657
Apr 10, 2026 961
Apr 9, 2026 1,250
Apr 8, 2026 1,640
Apr 7, 2026 2,150
Apr 6, 2026 2,660

Station Information

USGS Site No
04185000
State
OH
Coordinates
41.5045, -84.4297
Drainage Area
410 mi²
Datum (ft)
684.3
HUC Code
04100006
View on USGS NWIS →

Flood Stage Thresholds

Action Stage
9.0 ft
Flood Stage
11.0 ft
Moderate Flood
15.0 ft
Major Flood
16.5 ft

Currently 7.35 ft below flood stage.

Recent Extremes

Max discharge
3,670 cfs
Mar 13, 2026
Min discharge
11 cfs
Oct 16, 2025
Days at flood stage
0

Computed from the local daily-values archive.

Nearby Gauges