Hocking River at Enterprise OH

USGS Site No: 03157500Hocking River • Hocking County, OH

Hocking River at Enterprise OH on the Hocking River is currently at 981 cfs (High — 85th percentile for this date) . Gage height: 3.59 ft.

Reading from

981
CFS Discharge
3.59
Gage Height (ft)
High
Flow Condition
Normal
Flood Status

Historical Percentile Comparison

Today's discharge compared to the long-term record for June 11 at this station. Percentile rank shows what fraction of historical years had lower flow on this date.

Percentile Label CFS Threshold Today's Flow
10th Very Low threshold 92
25th Low threshold 120
50th (Median) Normal (median) 200
75th High threshold 397
95th Very High threshold 1,540 Today: 981 cfs

30-Day Hydrograph

Recent discharge plotted against the historical 10th–95th percentile envelope for the same calendar days. Source: USGS daily values + long-term statistics.

4.4k 2.2k 0 cfs Apr 6 May 28
10th–95th historical Day-of-year median Recent discharge

30-Day Flow History

Date Discharge (CFS) Gage Ht (ft)
May 28, 2026 2,520
May 27, 2026 1,350
May 26, 2026 1,070
May 25, 2026 2,240
May 24, 2026 1,560
May 23, 2026 1,780
May 22, 2026 385
May 21, 2026 398
May 20, 2026 360
May 19, 2026 153
May 18, 2026 162
May 17, 2026 166
May 16, 2026 164
May 15, 2026 171
Apr 21, 2026 202
Apr 20, 2026 223
Apr 19, 2026 250
Apr 18, 2026 256
Apr 17, 2026 263
Apr 16, 2026 275
Apr 15, 2026 282
Apr 14, 2026 285
Apr 13, 2026 300
Apr 12, 2026 314
Apr 11, 2026 335
Apr 10, 2026 358
Apr 9, 2026 387
Apr 8, 2026 419
Apr 7, 2026 472
Apr 6, 2026 531

Station Information

USGS Site No
03157500
State
OH
Coordinates
39.5651, -82.4746
Drainage Area
459 mi²
Datum (ft)
723.2
HUC Code
05030204
View on USGS NWIS →

Flood Stage Thresholds

Action Stage
9.0 ft
Flood Stage
12.0 ft
Moderate Flood
16.0 ft
Major Flood
21.0 ft

Currently 8.41 ft below flood stage.

Recent Extremes

Max discharge
5,720 cfs
Jul 1, 2025
Min discharge
51 cfs
Sep 21, 2025
Days at flood stage
0

Computed from the local daily-values archive.

Nearby Gauges